Road 103-169, Wexford, PA 15090 PROFESSIONAL SUMMARY
Thorough dependable Planner, Scheduler, Cost
Control, Project Controls Lead. Experience across a broad range of projects
ranging in value from $50K to $3B both domestically and overseas on
turnarounds, maintenance, engineering, procurement, and construction projects
in the oil & gas (upstream and downstream), refining, petrochemical, LNG,
manufacturing plant, transportation, buildings, pipelines projects.
Possesses combined skillsets and several years of experience in planning,
scheduling, cost control, progress measurement, earned value, estimating,
integrated activity planning, contract administration, change management,
risk analysis, budgeting, forecasting, and accruals. Good problem
solver, excellent computer and analytical skills, and solid writing
skills. I have a positive attitude, remain calm under pressure and
naturally develops good working relationships. Taught probability and
statistics at Virginia Tech. BSIE, MBA, PMP. ·
Upstream Oil and Gas (Pipelines, Well Pads, Compressor
Stations, Water Tanks / Impoundments, and Drilling / Hydraulic Fracturing
activities) ·
Downstream Refineries and Chemical Plants (New LNG Train,
Process Turnarounds, Maintenance) ·
Power (Gas Turbine, Boiler and Desalination Turnarounds) ·
Heavy Industrial Construction (Manufacturing Facility,
Renovate Process Plating Facility) ·
Heavy Civil Projects (Roads, Bridges, Site Preparation,
Fiber Optic, Power, Utilities, Buildings) ·
Information Technology and Software (SAP, Supply Chain,
Telecommunications) ·
Computer Skills: SAP, Primavera P6, Microsoft Project,
PRISM, Oracle Financials, Passport and Maximo Computerized Maintenance
Management Systems (CMMS), PRISM Project Manager Cost Package, Excel Pivot
Tables and Graphics, Access, PlanView, Price Waterhouse Coopers SummitD Life
Cycle, G2 Estimating, MPM, InstaPlan, DynaPlan, SureTrak, Artemis,
Expedition, At Risk, Monte Carlo, PERT Chart, WBS Chart, Process Charter,
SAS, Open Plan. EDUCATION BS,
Industrial Engineering, North Dakota State University MBA, Finance, Virginia Tech (VPISU) PMP, Certified Project Management Professional PROFESSIONAL
EXPERIENCE
Bechtel Corporation (Saudi
Arabia)
2014 – 2015 Project Controls Lead ·
Anticipated and resolved problems, bottlenecks /
scheduling conflicts across 31 major contracts on over $1.8 billion
work-scope for the Royal Commissions Jubail and Ras Al-Khair Industrial
Cities. Ensured engineering and construction remained on schedule. Site prep,
roads, utilities, electrical substations, pumping stations, telecom network,
labor camp, building projects. Reviewed Contractor submittals, managed
interface schedules, prepared project controls portion of the bid document,
budget tracking, and manpower coordination. ·
Supervised seven engineers. Coaching, wrote
performance reviews, timesheets, contractor invoices. Ran meetings,
gave presentations, time impact analysis. Guided the project planning
team to develop / review project schedules (level 1-4). Supervised the
progress measurement system such as manpower histograms and progress S
curves. Anticipated and resolved any problems, bottlenecks / scheduling
conflicts. Shell Oil Company
(Contract)
2010 – 2013 Senior Planning and Cost Engineer ·
Multi-billion dollar new infrastructure projects to
support construction of Shell's Upstream Marcellus Shale Gas Asset.
Developed CPM execution schedules and basis of schedule for Pipelines, Well
Pads, Compressor Stations, Water Tanks / Impoundments, and Drilling / Hydraulic
Fracturing activities. ·
Lead the Weekly Planners Meeting. Focal point for
the development of the Functional Activity Resource Loaded EPS Project
Schedule in support of the Integrated Activity Plan (IAP): activities, logic,
resources and progress. Primavera. ·
Worked with Contractors to improve the quality
of their schedules. Wrote contractor schedule guidelines: coding,
progress, change management. ·
Ensured timely issuance of Shells Client Schedule and
Reports; progress updates, forecast, critical path and trend analysis.
Primavera P6 R8.2, Prism. ·
Cost Control System: budgeting, earned value, change
management, accruals, SAP. Los Alamos National Laboratory (Contract)2008 - 2010 Project Controls Engineer IV ·
Execution through the integrated master schedule via the
Rolling Wave Eight Week (T8) Lock-in Schedule. 140 million, 16 PM’s,
and 300 field personnel. Primavera, Passport CMMS. ·
Develop project work plans including developing
engineering, construction, and maintenance schedules ·
Project costs: budgeting, EVMS, monthly accruals, change
management, ORACLE Financials. Valero Energy Corporation (Contract) (Previously El
Paso
Corp.)
2003 - 2008 Cost Engineer, Capital Projects Department,
2006-2008 ·
Budgeting, earned value, change orders, commitments,
expenditures, CAPEX MAEX forecasts, and accruals on 15 to 20 small-cap
process and power projects ranging in value from $100K - $10MM. Analyzed
trends, prepared project financial closure documentation. SAP, Primavera. Master Scheduler, (Maintenance Planner) Turnaround
Group,
2003-2006
·
Lead 8 to 14 planner schedulers on the execution and
implementation of scheduling processes, practices, and tools on 4 major T/A’s
and over 30 smaller TARs. WBS, OBS, calendars, resources, roles, coding
schemes. Provided P6 admin and training. SAP Maintenance Module.
Defined methodologies and processes to improve T/A performance. ·
Solved problems on multi-unit major TAR's: $100-150
million, 500k-700k actual hours, 1400-2000 people, 10 to 25
contractors/subcontractors. Extensive reporting and writing for the TAR
Team: Narratives, Monthly Accomplishments, Meeting Notes, AFE's, Five Year
Budget, Basis of Schedules. ·
Maintenance Planner role on multiple boiler and desalination
plant TAR's Flatiron Constructors
Inc.
2002 - 2003 Senior Scheduling Engineer, Estimating Department ·
Bid and proposal schedules for the construction of
large-scale road and bridge projects. P6 Positons also held at Fluor Daniel, Abu Dhabi Gas
Liquefaction Company, Saudi Arabian Marketing and Refining Company (now
ARAMCO), Science Applications International Corporation, and United
Technologies Corporation. Taught Probability and Statistics at Virginia Tech. OTHER: PMI, AACE. Saudi Council of Engineers, Tau Beta Pi,
Phi Kappa Phi, 3M Engineering Scholarship Recipient, Eagle Scout. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|